Job & Job Template Recost

Refresh existing JobBOSS job and template costs.

Keep recurring work and cost reviews based on the rates you intend to use. Select existing jobs, choose the labor and material scope, compare current and calculated values, then update and verify the result in JobBOSS.

Training guide: PDF · 16 pages. The shared recorded resource requires registration; use the current guide for the installed workflow.

THE BUSINESS CASE

Keep recurring work
based on current information.

Templates remain useful when their cost basis reflects the work you plan to repeat. Job Recost gives estimating, costing and production teams a focused workspace to refresh existing estimates after material costs or work-center rates change.

Use the same utility for a defined existing-job cost review. Build a deliberate target list, choose the relevant cost categories and explain the current/new differences before completing the update. Earlier template-only releases and newer layouts are product generations, not separate editions.

PRACTICAL CAPABILITIES

Choose the cost refresh you need.

01

Maintain useful templates

Bring recurring-work estimates into line with the intended material costs and work-center rates instead of carrying an older cost basis into the next job.

02

Choose the work that needs attention

Find existing jobs by the intended search criteria, or import a list of job IDs from Excel. Review the matches and accept only the jobs that belong in the batch.

03

Make the change explainable

Compare labor, burden, material, service and total values. Keep estimates and actuals distinct, then check both the saved job summary and representative detail.

FOUR INDEPENDENT COST CATEGORIES

Estimates or actuals.
Labor or materials.

A template refresh and an actual-cost correction need different settings. Choose the categories that match the task, then select the work centers, materials or employees that belong in that scope.

Labor estimates

Recalculate eligible inside-operation estimates using work-center rates and the existing estimated hours. Select the work centers that belong in the task.

Labor actuals

Recalculate selected actual-labor costs from existing time records using the intended work-center or employee-rate method. Confirm the employee and work-date scope against the full operation totals.

Material estimates

Select the materials and explicitly choose Standard, Average or Last cost. Check the master values and costing units before refreshing existing requirement estimates.

Material actuals

Choose the intended material actual-cost scope and basis. The lot-cost option has a specific lookup purpose; review its date and quantity behavior in the guide before applying it.

The category switches and item selections are separate controls. Enabling RECOST ESTIMATES or RECOST ACTUALS does not select work centers, materials or employees for you. Choose Standard, Average or Last explicitly for the material calculation.

GENERAL USAGE

Prepare. Select. Compare. Update.

Start with one understood job and one prepared scenario. The illustrated guide explains the working controls, comparison and saved-result checks.

  1. 01

    Prepare current data

    Maintain the intended rates and material cost values first. Open the correct company database, or use REFRESH DATA after source changes. Keep a baseline for the jobs to be reviewed.

  2. 02

    Build the target list

    Use ADD JOBS or import existing job IDs from Excel. Review the returned matches, check the intended jobs and ACCEPT. Every job in the main list belongs to the update batch; review child-assembly scope separately.

  3. 03

    Set the calculation

    Choose labor and material estimates or actuals independently. Select work centers, materials and any employees needed for the rate method. Explicitly choose the material basis and review optional settings.

  4. 04

    Preview and explain

    Use PREVIEW RECOST once for the prepared scenario. Compare Current Est with New Est and Current Act with New Act. Explain unexpected zeros, large changes or unchanged values before proceeding.

  5. 05

    Update and verify

    Use UPDATE JOBBOSS for the reviewed list. Reopen the affected jobs and check summary totals, representative unit and extended costs, labor rates and any synchronized fields. Confirm saved results before expanding the routine.

WHEN THE TASK CALLS FOR MORE

Extend the update deliberately.

Assembly processing and selected maintenance options are part of the same utility. Include their destinations in the review when they belong in the task.

Child assemblies

RECOST CHILD ASSEMBLIES expands the update through descendant jobs. The main comparison covers explicitly listed jobs, so review affected children separately and avoid processing the same child both directly and through a parent.

Estimate replacement

SET ESTIMATES EQUAL TO ACTUALS copies cost values during the update. Review the actual values supplying the replacement; New Est is not a separate preview of that substitution. It does not copy actual hours or quantities into the estimates.

Selling price and reference fields

Synchronize selected job selling prices from matching material-master selling prices when required. Applicable installed layouts also offer drawing and revision synchronization. Limit the targets to jobs whose fields should change.

Material vendors

UPDATE MATERIAL VENDORS can refresh requirement vendors from material-master primary vendors. With material recost enabled, it can visit all requirements on a target job, not only the checked material subset.

Percentage adjustments

Cost markups adjust calculated job category totals. Leave them at zero for an ordinary recost unless an agreed adjustment is part of the task. Detail rows do not automatically receive a matching percentage change.

The cost comparison does not display every optional selling-price, vendor, drawing or revision change. Verify those fields directly in JobBOSS after updating.

LEARN THE TOOL · KEEP THE REFERENCE

Training and downloads, together.

Share the overview with estimating, production and finance. Keep the illustrated guide beside the utility for selection, calculation and verification, and use the recordings for additional orientation.

PDF · 3 pages · 740 KB · November 2026

Product overview

Explore existing-job and template maintenance, independent labor and material scope, Excel target lists and the current-versus-calculated cost comparison.

PDF · 16 pages · 1227 KB · November 2026

Illustrated training guide

Follow preparation, job selection, Excel lists, labor and material choices, comparison, update and verification. Includes date and lot scope, assemblies, field synchronization, troubleshooting and a first-use exercise.

SHARED RECORDED RESOURCE

Keep the guide with the recording.

Open the recorded resource listed for Job Recost. This shared recording is also listed for Material Cost & Price Manager; the Job Recost guide provides the current task sequence and installed-layout differences.

Open the recording registration

Opens GoTo Webinar in a new tab. Registration is required. This recording is also listed for Material Cost & Price Manager; use the current Job Recost guide for the task sequence and installed options.

A QUICK WORKING REFERENCE

Common questions.

Selection and costing

Is Job Recost only for templates?

Templates are a major use case, and the job search also supports other statuses. Select the intended status and exact job IDs. Earlier template-only releases and newer screen layouts are product generations, not separate editions.

Do labor and materials have to change together?

No. Labor estimates, labor actuals, material estimates and material actuals have independent switches. Select the relevant items as well as the category. For a template refresh, choose estimates deliberately and leave unnecessary actual processing off.

Can I import a list from Excel?

Yes. Job Search IMPORT reads existing job IDs from column A of the first worksheet, with a header row. Use a clean XLSX or XLS file and preserve identifiers as text. Review the returned matches, then select and ACCEPT. The workbook identifies jobs; it does not import rates or cost values, and unknown IDs do not create jobs.

Why did a proposed cost stay the same or become zero?

The selected source value may already match the job. Check category switches, selected items, current data and the chosen master cost field. A zero master value or unsuitable unit-conversion data can produce a zero proposal. Explain unexpected values before updating.

What do the date ranges control?

The job-search date range selects Job Order Date. LABOR DATE RANGE uses labor Work Date. PICK DATE RANGE limits the issue lots used for the lot-cost lookup; it does not limit the material actual total to the quantity issued in that period. Confirm full operation totals when using a labor date or employee subset.

What does the lot-cost option use?

The documented workflow looks up current matching material and lot-location costs and averages those values. It does not reconstruct a quantity-weighted historical pick cost. That basis can also influence estimates when both material categories are enabled; leave estimates off when they should be preserved and verify the saved fields.

Why can quantity times unit cost differ from the total?

Raw stock can use different stocking and costing units. Check the unit conversion and both stored unit and extended costs. The displayed Cost Each is Total Cost divided by Order Quantity, so confirm that quantity before interpreting the per-unit result.

Applying and checking changes

Can I preview again with different assumptions?

Use REFRESH DATA or restart, then rebuild the target list and selections before calculating a different scenario. Explicitly click Standard, Average or Last again, even if it appears selected. In the documented Version 2 workflow, a subsequent preview can save earlier calculated operation changes. Repeated previews are not an isolated sandbox; CLEAR JOBS is not an undo or a fresh-data reset.

Can closed jobs be recosted?

They can be selected. Actual-cost changes affect historical job cost information rather than creating a new current-date adjusting entry. Confirm the intended period and reporting impact with the company’s costing owner before changing closed or previously reported work.

Does it update inventory transfers or change recorded quantities?

Job Recost updates cost and selected synchronization fields. It does not rebalance recorded hours, adjust stock quantities or rewrite historical material issue and transfer transactions. Review already-transferred work through the established costing process.

Will a parent job show every child in the preview?

The main comparison covers explicitly listed jobs. RECOST CHILD ASSEMBLIES expands the final update below a selected parent. Review descendant scope separately and confirm the saved results on affected children.

Does the selling-price option affect templates only?

Do not rely on the older template wording as a status restriction. The option can synchronize selected jobs from the matching material master. Choose only the jobs whose selling price should change.

Can a user be restricted to estimates only?

The documented utility workflow does not provide a separate estimate-only permission. Have the administrator manage access to the installed utility and ensure users understand the approved costing process and database connection.

Where are Detail and Excel export?

Newer installed revisions may provide a per-job Detail window and Excel export for analysis. Use those controls where available. The illustrated Version 2 layout shows summary comparisons; JobBOSS job details and available cost reports support verification in that layout.

What should I do after an error or an unexplained result?

Keep the error text, target list, settings and approximate time. Check which jobs and descendants have already changed before repeating the batch. Refresh current data and resolve the cause with Neptune or the setup contact. Do not assume the entire batch rolled back or that a success message replaces detail verification.

Need help with a recost result? Contact Neptune with the installed version, database context, exact job IDs, chosen basis and options, relevant dates, and expected versus saved result. Include the exact error when available. Sales@NeptuneNetworking.com

IS THIS THE RIGHT TOOL?

A good fit for

Estimating, costing and production teams maintaining templates, refreshing selected existing-job estimates or carrying out a defined actual-cost correction with a clear target list.

Talk through your use case

What we’ll review together

  • The jobs or templates, cost categories and source rates you intend to use.
  • Your installed layout, optional assembly scope and field-synchronization needs.
  • A representative comparison and the saved JobBOSS results to verify.

We’ll confirm the applicable version, configuration and installation scope for your JobBOSS environment.

START WITH THE COSTING OBJECTIVE

Give existing work a useful cost basis.

Tell us which jobs or templates need a refresh and which costs should change. Your inquiry will already identify Job & Job Template Recost.

Ask about this solution